Case Study
50 Locations. €500,000 Potential.
How a multi-site company found its roadmap to resource efficiency.

The Challenge
A German company with around 50 locations faced a classic hurdle: decarbonization targets, energy efficiency goals, a target for the share of green energy, a data landscape that still needed improvement regarding the status quo, and growing regulatory requirements especially for the building stock (GEG).
"Where do we start to achieve maximum impact with minimal investment?"
The Dauri Logic
Instead of getting stuck in lengthy analyses, Dauri uses a systematic logic to evaluate the best ratio of CO₂ impact and return on investment for the company.
Our partner Enion validates these pathways from a building engineering perspective and ensures that all steps comply with the Building Energy Act (GEG) and future regulatory requirements.

| Metric | Projected Result (p.a.) |
|---|---|
Operational Cost Reduction ~€500,000 | |
CO₂ Reduction ~10% through low-investment measures | |
Status Planning completed Implementation started | |
The Solution: Data-Driven Roadmap Instead of Guesswork
Instead of renovating the entire building stock across the board at high capital cost, the goal is: what should we definitely initiate today, and what should we examine more closely?
Potential Screening
Identification of the most impactful levers for the specific multi-site company.
Economic Viability Check
Every measure was evaluated against CO₂, kWh, and Euro (ROI) to create a reliable forecast.
Regulatory Compliance
Our partner Enion provided in-depth analysis of building standards and GEG requirements to future-proof the roadmap.
Clear Priorities
Which 'low-hanging fruits' can we initiate today and use to finance the next steps?
The Lever: Low Investment, High Impact
The analysis identified a series of quickly implementable measures that deliver enormous leverage across multiple locations. Through optimizations such as smart thermostat logic and systematic plug-load management, the results per location are:
~€10,000
Savings potential on energy costs
~18 t CO₂
Avoidance potential per location
Conclusion: The Foundation for Implementation Is Set
The first and often hardest step — creating transparency and setting priorities — is done. The company now has a validated roadmap and is currently starting the structured rollout of measures. Initially without major construction work.
With Dauri as the management infrastructure and Enion for technical expertise, the client has a professional foundation for every future investment decision.
The uncertainty is out of the planning, clear first steps are defined, and a roadmap has been created that puts the simple and feasible steps forward.